Bobst folder-gluer and Komori offset press on the Ess Cee Print Pack production floor
Production Floor

Infrastructure & Machinery

40+ machines across six production stages, run from a single 70,000 sq. ft facility in Peenya.

Around The Facility

Inside the production floor

01

Automated Die-Cutting

Bobst 104 SE die-cutter shaping folding cartons to spec on the production floor.

Bobst 104 SE automatic die-cutting machine
02

6-Colour Offset Printing

RMGT 790ST B2 press with in-line coater for high-volume carton and label runs.

RMGT 790ST 6-colour offset press with coater
03

5-Colour Offset Printing

Komori Lithrone G40 press with coater running a production job.

Komori Lithrone G40 5-colour offset press with coater
04

Premium Press Line

Heidelberg Speedmaster CD 102 with coater for high-end finish output.

Heidelberg Speedmaster CD 102 press with coater
05

Corrugation

In-house corrugation line producing board for rigid boxes and cartons.

Corrugation machine producing board on the shop floor
06

Carton Stripping

SUBA Blankwiser stripping waste from die-cut carton blanks.

SUBA Blankwiser carton stripping machine
07

Folding & Gluing

Bobst Expertfold folder-gluer converting flat blanks into finished cartons at speed.

Bobst Expertfold carton folder-gluer machine
08

Carton Inspection

Autoprint Checkmate vision system inspecting cartons for print and colour defects.

Autoprint Checkmate carton inspection machine
09

Prepress & CTP

Screen PlateRite CTP system producing plates ahead of every press run.

Screen PlateRite computer-to-plate (CTP) machine
10

Quality Check & Packing

Hand finishing and pack-out on the production floor.

Staff hand-finishing and packing product on the floor
11

Admin & Coordination

Order processing and production coordination desks.

Admin office workstations
12

Conference Room

Meeting space for client and production discussions.

Conference room at the facility
13

Reception Lounge

The entrance lounge welcoming clients and visitors.

Reception and lounge area at the facility entrance
14

Staff Cafeteria

Rooftop dining space for the production team.

Rooftop staff cafeteria
15

Facility Entrance

The Ess Cee Enterprises building in Peenya Industrial Area.

Ess Cee Enterprises building exterior in Peenya Industrial Area
Capacity Planning

Discuss volumes against our machine capacity

Enquire Now